Overview of the role

Preparing and delivering a high standard of technical work relating to the construction and renewal of the Tramway and the Tramway environment.

Details of standard

Occupation summary

This occupation is found in the Tramway and Light Rail Construction sector.

The broad purpose of the occupation is to prepare and deliver a high standard of technical work relating to the construction and renewal of the Tramway and the Tramway environment.

In their daily work, an employee in this occupation interacts with a team and reports to a site supervisor or team leader. The role may interact with others working on the construction and renewal of the Tramway such as those conducting site surveys, engineers, designers and installing the overhead lines etc. Types of employers range between private companies, local authorities, councils etc.. An employee in this occupation will be responsible for activities relating to the construction and renewal of the Tramway, including, setting up and maintaining a temporary traffic management system including assisting stakeholders with access and deliveries, lifting and moving large and irregular shaped loads, installing and removing temporary works, using a range of hand held tools, equipment and items of plant and being able to carry out site clearance activities such as the removal of waste items and the storage of reusable materials and components. Whilst undertaking these activities, operatives are expected to adhere to strict codes of conduct and safe working practices including wearing the appropriate personal protective equipment, following the correct safe systems and taking action to minimise risk to self and others.

Operatives work in shifts and outdoors often in challenging inner city or town environments. A knowledge of the environment, how pedestrianised and road traffic areas relate to each other and the relationship between the relevant stakeholders is essential as well as a detailed understanding of the effect the works (noise, dust, vibration, traffic control and management systems) can have on the surrounding environment. This includes different types of building such as grade II listed, the public who may be working/shopping/visiting/passing through the area and the businesses that need to be able to operate whist works are being carried out. Presentation and conduct when working in a public facing/urban and open working environment is important and operatives are expected to adhere to organisational policies and requirements and have the skills to be able to deal with questions and enquiries as well as challenging behaviour by others who may be affected, frustrated or disrupted by the work being undertaken. The inner city or urban environment can present many other challenges including, interaction with contractors on other construction projects and a restriction on working space. Being able to manoeuvre large and irregular shaped loads through the confines of the urban environment is a skill apprentices will learn as well as techniques for carrying out activities with minimal noise, dust, vibration etc. Often the use of large plant equipment is not possible and manual techniques are required. The cities and towns in England are often steeped in history and digging and excavating can often uncover a wide range of items, most commonly utilities (live and historic) not shown on plans and specifications. Knowing how to identify, deal and report with these items is an important part of the role.

The level of customer interaction can be high as the tramway construction environment is often what’s known as ‘open working’ which makes this different to other construction activities which usually take place in a closed environment/site. Operatives are working in areas where there are many nearby businesses or houses which have to remain open and accessible and as such members of the general public will be nearby and will be able to see the works being undertaken. Operatives conduct and behaviour is particularly important as they represent not only the individual organisations undertaking the construction and renewals activities but the industry as a whole. The apprenticeship will contain knowledge skills and behaviours to prepare an operative for customer interaction including the skills to deal with questions and be able to de-escalate issues and potential conflict. The ability to manage challenging situations is a regular occurrence.

Typical job titles include:

Light rail construction operative Tramway construction operative

Occupation duties

Duty Criteria for measuring performance KSBs

Duty 1 Follow instructions and take responsibility for minimising risk and ensuring own safety and the safety of the team

Work is in line with briefing prior to commencement of shift

Health, safety and security requirements are adhered to

Problems and issues are dealt with promptly and effectively

K2 K4

S1 S2 S3 S4

B1 B2 B3 B4

Duty 2 Set up and maintain a temporary traffic management system

Health, safety and security requirements are adhered to, including, safety at Streetworks and Road Works code of practice (red book) is adhered to

Safe Systems of Work are adhered to e.g. to reduce roadside risk

Deadlines are met

Communication is effective and efficient

Problems and issues are dealt with promptly and effectively

Considerations are taken into account and reported e.g. visibility, safety zones, traffic flow

K2 K4

S1 S2 S3 S5 S6 S7

B1 B2 B3 B4

Duty 3 Lift, move and install large and irregular shaped loads

Health, safety and security requirements are adhered to e.g. manual handling

Safe Systems of Work are adhered to

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

Operational constraints are taken in to account e.g. weather conditions, space/access, noise and vibration levels

Characteristics are taken into account e.g. weight, shape, length, size

K1 K2 K4

S1 S2 S3 S4 S6 S7

B1 B2 B3 B4

Duty 4 Install reinforced concrete (such as tram stops, retaining walls, platforms, ducting and drainage)

Work is in line with specification, RAMS and checked against inspection and test plan

Health, safety and security requirements are adhered to

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

Methods and techniques used for poring and finishing are correctly applied

K1 K2 K3 K4 K5

S1 S2 S3 S4 S7 S8

B1 B2 B3 B4

Duty 5 Lay tarmac, kerbs and channels

Health, safety and security requirements are adhered to

Work is in line with specification, RAMS and checked against inspection and test plan

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

Methods and techniques used for laying and finishing are correctly applied

K1 K2 K3 K4 K5

S1 S2 S3 S4 S7 S8

B1 B2 B3 B4

Duty 6 Locate, dig and excavate buried utility services

Health, safety and security requirements are adhered to

Work is in line with safe systems of work, i.e. Permit to Dig

Work is in line with the requirements of New Roads & Street Works Act

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

Activities are carried out in line with organisational requirements

K1 K2 K3 K4 K5

S1 S2 S3 S4 S7 S8

B1 B2 B3 B4

Duty 7 Assist with installing light rail track, points, switches and crossing

Health, safety and security requirements are adhered to, including protection arrangements

Work is in line with specification, RAMS and checked against inspection and test plan

Safe systems of work are adhered to

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

Activities are carried out in line with organisational requirements

K1 K2 K3 K4 K5

S1 S2 S3 S4 S7 S8

B1 B2 B3 B4

Duty 8 Assist with installing steelwork structures such as OLE (Overhead Line Equipment)

Health, safety and security requirements are adhered to

Work is in line with specification, RAMS and checked against inspection and test plan

Safe systems of work are adhered to

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

Activities are carried out in line with organisational requirements

K1 K2 K3 K4 K5

S1 S2 S3 S4 S7 S8

B1 B2 B3 B4

Duty 9 Carry out site clearance activities and ensure all equipment is secure and safe

Health, safety and security requirements are adhered to

Work is in line with site waste management plan

Safe systems of work are adhered to

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

K1 K2 K4

S1 S6 S7 S9

B1 B2 B3 B4

Duty 10 Identify, deal with and report issues and problems

Health, safety and security requirements are adhered to

Safe systems of work are adhered to

Actions are taken to minimise risk

Communication is effective and efficient

Deadlines are met

K1 K2 K4 K5

S7 S10 S11

B1 B2 B3 B4

Duty 11 Provide assistance to customers and members of the public

Health, safety and security requirements are adhered to
Safe systems of work are adhered to
Actions are taken to minimise risk
Communication is effective and efficient
Assistance is provided promptly

K1 K2 K4

S7 S10 S11

B1 B2 B3 B4


KSBs

Knowledge

K1: The tramway environment, its history, customers, relationship between stakeholders (landowners, councils, businesses, general public), range of structures and components (buildings, including grade II listed, bridges, tunnels etc.) and the interface with Heavy Railway, Highways and the pedestrianised environment. Back to Duty

K2: Safe working practices, legislation and organisational policies, procedures, requirements and systems in place relating to fitness for duty, health, safety and security including those for noise, dust and vibration control, working with limited space and access, working in an open/public/urban environment, working on or near a road or track. Back to Duty

K3: The principles of civil engineering and the range of construction and inspection methods and techniques required for the construction and renewal of the Tramway, including understanding the range of components, acceptable tolerances, geometry specifications and the factors which may affect Tramway construction. Back to Duty

K4: Codes of conduct, organisational expectations and requirements including those relating to working with others, working in public facing/open working environment, quality expectations and working solutions that support environmental sustainability. Back to Duty

K5: The operational Tramway, its components, functionality, signalling principles and characteristics. Back to Duty

Skills

S1: Contribute to safe working practices and procedures, including wearing the appropriate personal protective equipment and follow the appropriate rules and procedures relating to safe systems of work in the Tramway environment, including working at heights and in confined spaces/trenches and on or near roads or track. Back to Duty

S2: Ensure all preparations for the shift have been carried out and all relevant information has been communicated and understood. Back to Duty

S3: Access and follow information and documentation to support construction and renewals activities, including method statements, risk assessments, plans, specifications, manuals etc. Back to Duty

S4: Select, inspect and prepare hand held tools, equipment and items of plant to support construction and renewals activities, ensuring calibration tolerances have been met as applicable. Back to Duty

S5: Set up and maintain a temporary traffic management system and install barriers, signage and pedestrian walkways as required. Back to Duty

S6: Lift, move and install large and irregular shaped loads using appropriate equipment and/or methods within restricted space confinements. Back to Duty

S7: Communicate relevant and technical information clearly and timely, using appropriate equipment, verbal and non-verbal communication methods to colleagues and customers. Back to Duty

S8: Safely carry out construction and renewals activities, including: Installation and removal of temporary works. Installation of concrete, reinforced track form, tram stops, retaining walls, platforms, ducting and drainage. Laying of tarmac, kerbs and channels. Digging and excavation ensuring utilities are protected and avoided using approved techniques and procedures. Assisting with installation of steelwork structures and components (such as OLE framework), using approved methods and techniques including welding, assembling bolted joints. Assisting with Installation and renewal of light rail track, points, switches and crossings. Back to Duty

S9: Carry out site clearance activities, dealing with waste items, storage of reusable materials and components. Back to Duty

S10: Deal with incidents, accidents and emergencies, taking action to minimise risk to self and others e.g. minimising risk of cable strike, applying first aid. Back to Duty

S11: Deal with conflict and/or challenging behaviour, de-escalating issues and providing assistance which is considerate of risk and promotes good will. Back to Duty

Behaviours

B1: Safety – The ability to recognise and speak up when problems and potential safety issues arise and to stop work immediately. Remain calm under pressure and take responsibility to minimise risks and report/log close calls. Adhere to safe systems of work and relevant procedures including attending all safety briefings and training. Back to Duty

B2: Quality – Embrace new tasks and activities, agree achievable deadlines and have the confidence to ask questions, clarify understanding. Pay attention to detail, providing accurate, complete and relevant information. Back to Duty

B3: Customer Service – Work collaboratively, show respect for others, do what has been agreed and offer assistance to others when help is needed. Be friendly and approachable, providing timely answers and explanations. Act as a good listener. Back to Duty

B4: Professionalism – Be prepared for work, arrive on time and present a positive attitude and appearance. Back to Duty


Qualifications

English and Maths


Additional details

Occupational Level:

2

Duration (months):

18

Review

Status: Approved for delivery (available for starts)
Level: 2
Reference: ST0669
Version: 1.0
Date updated: 15/02/2023
Approved for delivery: 28 March 2019
Route: Construction and the built environment
Typical duration to gateway: 18 months (this does not include EPA period)
Maximum funding: £15000
LARS Code: 428
EQA Provider: Ofqual
Employers involved in creating the standard: Midland Metro Alliance, Blackpool Council, Auctus Management Group, Egis, Colas Rail Ltd, Bouygues UK, Colas Ltd, Stagecoach Supertram SYSL, Barhale Ltd, Transport for Greater Manchester, Transport for London, Pell Frischmann, UK Tram

Version log

Version Change detail Earliest start date Latest start date
1.0 Approved for delivery 28/03/2019 Not set

Crown copyright © 2024. You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. Visit www.nationalarchives.gov.uk/doc/open-government-licence

Is this webpage useful?

Thank you for your feedback

Tell us about your experience